General Guidelines
In addition to the federal guidelines, there are some general guidelines DD Councils operate under.
- Match amounts are different based on the type of project.
- Councils should have a system in place to look at matching on a project-by-project level to determine the overall match.
- Councils must be able to look at match project by project with the appropriate required match to determine if there is a match, overmatch, or undermatch.
- Councils have until the end of each project period to reach the match amount.
- Keep detailed documentation on file for each year to support the match (cost sharing) amounts on each annual SF-425

Carla: “I have several projects that I need to calculate match amounts for. But first, I need to know if they are in an urban/ rural poverty area. Let’s learn how to determine if a project is in one of these areas. “